top of page
new logo 2.png
new logo 2.png

Rapid U.S. Insourcing

Global Consumer Technology Startup

Insourced manufacturing to the U.S. in five months, leading to a double digit reduction in direct manufacturing cost.

Challenge

  • Inflexible contract manufacturer, oversized and costly setup, no ability to scale with demand.

  • Exposure to tariff volatility and competitive pressure from low-cost Chinese rivals.


Actions

  • Transferred materials and production line in close collaboration with the contract manufacturer.

  • Transformed an existing warehouse into a fully operational production facility.

  • Set up systems and processes, hired and trained staff, and implemented a TÜV-certified QMS and production line within five months.

  • Integrated repair and manufacturing into one cohesive team to improve efficiency.


Results

  • 70% reduction in direct manufacturing cost.

  • TÜV-certified U.S. operation established in record time.

  • Improved flexibility to build-to-demand.

  • Reduced exposure to tariff volatility and competitive risk.

Facing a similar challenge?

Let's talk.

bottom of page